Trias Westland geothermal project reached claylayers above reservoir
Monday April 16th the wellsite geologists of T&A Survey/AmsterdamPG have established that the claylayers situated above the reservoir of the Trias Westland geothermal project have been reached. Next, the borehole will be stabilized with a cement liner, in order to allow the drilling of the last trajectory, which will go through the geothermal reservoir.
Other news
- GLOBE Claritas course: Practical introduction to Seismic Processing
- Michiel van Oers takes over from Robert van Ingen as CEO
- Trias Westland geothermal drilling reached final depth
- GLOBE Claritas Land Seismic Processing training course
- T&A study maps the potential of Ultra Deep Geothermal energy
- Trias Westland: successfull production test of the Lower Creatceous
- Trias Westland to become Lower Cretaceous project
- Triassic drilling almost reached final depth
- Geothermal drilling is approaching Triassic layer!
- Trias drilling approaches depth of 2.550 meters!
- GLOBE Claritas Land seismic processing course
- TISA 3D development - September 2017 update
- Trias Westland: a geothermal update
- E&P meets renewables at Offshore Energy 2017
- Green Deal: 30% of industrial heat demand from Ultra Deep Geothermal
- Trias Westland geothermal project officially started
- Investigating Ultra Deep Geothermal (UDG) in The Netherlands
- Boost your Project with Reprocessed Data!
- Innovation Credit for TISA 3D Borehole Radar
- Drone methane detector: finding leaks quickly and safely
- Presenting 2D analyis of Chalk potential at EBN Exploration Day